when did the NEC code start to require the separation of neutral and ground bus bars after main disconnect

The name of the pictureThe name of the pictureThe name of the pictureClash Royale CLAN TAG#URR8PPP





.everyoneloves__top-leaderboard:empty,.everyoneloves__mid-leaderboard:empty margin-bottom:0;







up vote
1
down vote

favorite












you gave the answer below to the question of the requirement for separate bus bars after the main disconnect box ... my question is ...



in what year did the NEC code start to require this separation?
what is the code #?



There are supposed to be two bus bars in every panel. One for neutrals, and one for grounds.



In the main panel ONLY, they are to be bonded together. This is what references your electrical system to earth voltage. It must only be done one place in a system.



Because of the required bond in the main panel, a great many electricians conclude that there is no difference between neutral and ground in the main panel since the N-G bond is right there. And they simply spam all neutrals and grounds onto the same bus. That logic is actually... reasonable... in the main panel.



However... If you want to be a precise and competent worker, then you separate them always, as if every panel were a subpanel, and let the neutral-ground bond do its job










share|improve this question







New contributor




Ted Friel is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
Check out our Code of Conduct.



















  • I completely agree with your last few paragraphs. I always separate neutral and ground, least to make converting a main panel to a sub a "snap". Of course I also work mainly in EMT, so there's no ground bar at all. .... Which explains why some panels don't come with them.
    – Harper
    3 mins ago
















up vote
1
down vote

favorite












you gave the answer below to the question of the requirement for separate bus bars after the main disconnect box ... my question is ...



in what year did the NEC code start to require this separation?
what is the code #?



There are supposed to be two bus bars in every panel. One for neutrals, and one for grounds.



In the main panel ONLY, they are to be bonded together. This is what references your electrical system to earth voltage. It must only be done one place in a system.



Because of the required bond in the main panel, a great many electricians conclude that there is no difference between neutral and ground in the main panel since the N-G bond is right there. And they simply spam all neutrals and grounds onto the same bus. That logic is actually... reasonable... in the main panel.



However... If you want to be a precise and competent worker, then you separate them always, as if every panel were a subpanel, and let the neutral-ground bond do its job










share|improve this question







New contributor




Ted Friel is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
Check out our Code of Conduct.



















  • I completely agree with your last few paragraphs. I always separate neutral and ground, least to make converting a main panel to a sub a "snap". Of course I also work mainly in EMT, so there's no ground bar at all. .... Which explains why some panels don't come with them.
    – Harper
    3 mins ago












up vote
1
down vote

favorite









up vote
1
down vote

favorite











you gave the answer below to the question of the requirement for separate bus bars after the main disconnect box ... my question is ...



in what year did the NEC code start to require this separation?
what is the code #?



There are supposed to be two bus bars in every panel. One for neutrals, and one for grounds.



In the main panel ONLY, they are to be bonded together. This is what references your electrical system to earth voltage. It must only be done one place in a system.



Because of the required bond in the main panel, a great many electricians conclude that there is no difference between neutral and ground in the main panel since the N-G bond is right there. And they simply spam all neutrals and grounds onto the same bus. That logic is actually... reasonable... in the main panel.



However... If you want to be a precise and competent worker, then you separate them always, as if every panel were a subpanel, and let the neutral-ground bond do its job










share|improve this question







New contributor




Ted Friel is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
Check out our Code of Conduct.











you gave the answer below to the question of the requirement for separate bus bars after the main disconnect box ... my question is ...



in what year did the NEC code start to require this separation?
what is the code #?



There are supposed to be two bus bars in every panel. One for neutrals, and one for grounds.



In the main panel ONLY, they are to be bonded together. This is what references your electrical system to earth voltage. It must only be done one place in a system.



Because of the required bond in the main panel, a great many electricians conclude that there is no difference between neutral and ground in the main panel since the N-G bond is right there. And they simply spam all neutrals and grounds onto the same bus. That logic is actually... reasonable... in the main panel.



However... If you want to be a precise and competent worker, then you separate them always, as if every panel were a subpanel, and let the neutral-ground bond do its job







subpanel






share|improve this question







New contributor




Ted Friel is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
Check out our Code of Conduct.











share|improve this question







New contributor




Ted Friel is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
Check out our Code of Conduct.









share|improve this question




share|improve this question






New contributor




Ted Friel is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
Check out our Code of Conduct.









asked 1 hour ago









Ted Friel

61




61




New contributor




Ted Friel is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
Check out our Code of Conduct.





New contributor





Ted Friel is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
Check out our Code of Conduct.






Ted Friel is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
Check out our Code of Conduct.











  • I completely agree with your last few paragraphs. I always separate neutral and ground, least to make converting a main panel to a sub a "snap". Of course I also work mainly in EMT, so there's no ground bar at all. .... Which explains why some panels don't come with them.
    – Harper
    3 mins ago
















  • I completely agree with your last few paragraphs. I always separate neutral and ground, least to make converting a main panel to a sub a "snap". Of course I also work mainly in EMT, so there's no ground bar at all. .... Which explains why some panels don't come with them.
    – Harper
    3 mins ago















I completely agree with your last few paragraphs. I always separate neutral and ground, least to make converting a main panel to a sub a "snap". Of course I also work mainly in EMT, so there's no ground bar at all. .... Which explains why some panels don't come with them.
– Harper
3 mins ago




I completely agree with your last few paragraphs. I always separate neutral and ground, least to make converting a main panel to a sub a "snap". Of course I also work mainly in EMT, so there's no ground bar at all. .... Which explains why some panels don't come with them.
– Harper
3 mins ago










1 Answer
1






active

oldest

votes

















up vote
2
down vote













You're after NEC 250.32(B)(1)



The applicable NEC section is 250.32(B)(1), which reads as follows ("equipment grounding conductor" = "ground" and "grounded conductor" = "neutral" for us, and exception 2 is irrelevant for this):




(1) Supplied by a Feeder or Branch Circuit. An equipment
grounding conductor, as described in 250.118, shall be run
with the supply conductors and be connected to the building
or structure disconnecting means and to the grounding electrode(s). The equipment grounding conductor shall be used
for grounding or bonding of equipment, structures, or frames
required to be grounded or bonded. The equipment grounding conductor shall be sized in accordance with 250.122. Any
installed grounded conductor shall not be connected to the
equipment grounding conductor or to the grounding electrode(s).



Exception No. 1: For installations made in compliance with previous
editions of this Code that permitted such connection, the grounded
conductor run with the supply to the building or structure shall be
permitted to serve as the ground-fault return path if all of the following
requirements continue to be met:



(1) An equipment grounding conductor is not run with the supply to
the building or structure.



(2) There are no continuous metallic paths bonded to the grounding
system in each building or structure involved.



(3) Ground-fault protection of equipment has not been installed on
the supply side of the feeder(s).



If the grounded conductor is used for grounding in accordance with
the provision of this exception, the size of the grounded conductor shall
not be smaller than the larger of either of the following:



(1) That required by 220.61



(2) That required by 250.122




The current state of this section was reached in the 2008 NEC, which forbade new construction from using the feeder neutral to provide ground for the fed system. (Your choices now are to provide a separate ground wire, which is what is normally done, or use a distribution transformer to create a separately derived system for the fed building, which has its own N-G bond.) Many of the installations that fall under the current exception were installed prior to the 1999 NEC, which is the first edition that forbade parallel current paths between the structures involved.






share|improve this answer




















  • I agree with 1999 as the first required isolation of netural from ground.
    – Ed Beal
    53 mins ago










Your Answer







StackExchange.ready(function()
var channelOptions =
tags: "".split(" "),
id: "73"
;
initTagRenderer("".split(" "), "".split(" "), channelOptions);

StackExchange.using("externalEditor", function()
// Have to fire editor after snippets, if snippets enabled
if (StackExchange.settings.snippets.snippetsEnabled)
StackExchange.using("snippets", function()
createEditor();
);

else
createEditor();

);

function createEditor()
StackExchange.prepareEditor(
heartbeatType: 'answer',
convertImagesToLinks: false,
noModals: false,
showLowRepImageUploadWarning: true,
reputationToPostImages: null,
bindNavPrevention: true,
postfix: "",
noCode: true, onDemand: true,
discardSelector: ".discard-answer"
,immediatelyShowMarkdownHelp:true
);



);






Ted Friel is a new contributor. Be nice, and check out our Code of Conduct.









 

draft saved


draft discarded


















StackExchange.ready(
function ()
StackExchange.openid.initPostLogin('.new-post-login', 'https%3a%2f%2fdiy.stackexchange.com%2fquestions%2f149477%2fwhen-did-the-nec-code-start-to-require-the-separation-of-neutral-and-ground-bus%23new-answer', 'question_page');

);

Post as a guest






























1 Answer
1






active

oldest

votes








1 Answer
1






active

oldest

votes









active

oldest

votes






active

oldest

votes








up vote
2
down vote













You're after NEC 250.32(B)(1)



The applicable NEC section is 250.32(B)(1), which reads as follows ("equipment grounding conductor" = "ground" and "grounded conductor" = "neutral" for us, and exception 2 is irrelevant for this):




(1) Supplied by a Feeder or Branch Circuit. An equipment
grounding conductor, as described in 250.118, shall be run
with the supply conductors and be connected to the building
or structure disconnecting means and to the grounding electrode(s). The equipment grounding conductor shall be used
for grounding or bonding of equipment, structures, or frames
required to be grounded or bonded. The equipment grounding conductor shall be sized in accordance with 250.122. Any
installed grounded conductor shall not be connected to the
equipment grounding conductor or to the grounding electrode(s).



Exception No. 1: For installations made in compliance with previous
editions of this Code that permitted such connection, the grounded
conductor run with the supply to the building or structure shall be
permitted to serve as the ground-fault return path if all of the following
requirements continue to be met:



(1) An equipment grounding conductor is not run with the supply to
the building or structure.



(2) There are no continuous metallic paths bonded to the grounding
system in each building or structure involved.



(3) Ground-fault protection of equipment has not been installed on
the supply side of the feeder(s).



If the grounded conductor is used for grounding in accordance with
the provision of this exception, the size of the grounded conductor shall
not be smaller than the larger of either of the following:



(1) That required by 220.61



(2) That required by 250.122




The current state of this section was reached in the 2008 NEC, which forbade new construction from using the feeder neutral to provide ground for the fed system. (Your choices now are to provide a separate ground wire, which is what is normally done, or use a distribution transformer to create a separately derived system for the fed building, which has its own N-G bond.) Many of the installations that fall under the current exception were installed prior to the 1999 NEC, which is the first edition that forbade parallel current paths between the structures involved.






share|improve this answer




















  • I agree with 1999 as the first required isolation of netural from ground.
    – Ed Beal
    53 mins ago














up vote
2
down vote













You're after NEC 250.32(B)(1)



The applicable NEC section is 250.32(B)(1), which reads as follows ("equipment grounding conductor" = "ground" and "grounded conductor" = "neutral" for us, and exception 2 is irrelevant for this):




(1) Supplied by a Feeder or Branch Circuit. An equipment
grounding conductor, as described in 250.118, shall be run
with the supply conductors and be connected to the building
or structure disconnecting means and to the grounding electrode(s). The equipment grounding conductor shall be used
for grounding or bonding of equipment, structures, or frames
required to be grounded or bonded. The equipment grounding conductor shall be sized in accordance with 250.122. Any
installed grounded conductor shall not be connected to the
equipment grounding conductor or to the grounding electrode(s).



Exception No. 1: For installations made in compliance with previous
editions of this Code that permitted such connection, the grounded
conductor run with the supply to the building or structure shall be
permitted to serve as the ground-fault return path if all of the following
requirements continue to be met:



(1) An equipment grounding conductor is not run with the supply to
the building or structure.



(2) There are no continuous metallic paths bonded to the grounding
system in each building or structure involved.



(3) Ground-fault protection of equipment has not been installed on
the supply side of the feeder(s).



If the grounded conductor is used for grounding in accordance with
the provision of this exception, the size of the grounded conductor shall
not be smaller than the larger of either of the following:



(1) That required by 220.61



(2) That required by 250.122




The current state of this section was reached in the 2008 NEC, which forbade new construction from using the feeder neutral to provide ground for the fed system. (Your choices now are to provide a separate ground wire, which is what is normally done, or use a distribution transformer to create a separately derived system for the fed building, which has its own N-G bond.) Many of the installations that fall under the current exception were installed prior to the 1999 NEC, which is the first edition that forbade parallel current paths between the structures involved.






share|improve this answer




















  • I agree with 1999 as the first required isolation of netural from ground.
    – Ed Beal
    53 mins ago












up vote
2
down vote










up vote
2
down vote









You're after NEC 250.32(B)(1)



The applicable NEC section is 250.32(B)(1), which reads as follows ("equipment grounding conductor" = "ground" and "grounded conductor" = "neutral" for us, and exception 2 is irrelevant for this):




(1) Supplied by a Feeder or Branch Circuit. An equipment
grounding conductor, as described in 250.118, shall be run
with the supply conductors and be connected to the building
or structure disconnecting means and to the grounding electrode(s). The equipment grounding conductor shall be used
for grounding or bonding of equipment, structures, or frames
required to be grounded or bonded. The equipment grounding conductor shall be sized in accordance with 250.122. Any
installed grounded conductor shall not be connected to the
equipment grounding conductor or to the grounding electrode(s).



Exception No. 1: For installations made in compliance with previous
editions of this Code that permitted such connection, the grounded
conductor run with the supply to the building or structure shall be
permitted to serve as the ground-fault return path if all of the following
requirements continue to be met:



(1) An equipment grounding conductor is not run with the supply to
the building or structure.



(2) There are no continuous metallic paths bonded to the grounding
system in each building or structure involved.



(3) Ground-fault protection of equipment has not been installed on
the supply side of the feeder(s).



If the grounded conductor is used for grounding in accordance with
the provision of this exception, the size of the grounded conductor shall
not be smaller than the larger of either of the following:



(1) That required by 220.61



(2) That required by 250.122




The current state of this section was reached in the 2008 NEC, which forbade new construction from using the feeder neutral to provide ground for the fed system. (Your choices now are to provide a separate ground wire, which is what is normally done, or use a distribution transformer to create a separately derived system for the fed building, which has its own N-G bond.) Many of the installations that fall under the current exception were installed prior to the 1999 NEC, which is the first edition that forbade parallel current paths between the structures involved.






share|improve this answer












You're after NEC 250.32(B)(1)



The applicable NEC section is 250.32(B)(1), which reads as follows ("equipment grounding conductor" = "ground" and "grounded conductor" = "neutral" for us, and exception 2 is irrelevant for this):




(1) Supplied by a Feeder or Branch Circuit. An equipment
grounding conductor, as described in 250.118, shall be run
with the supply conductors and be connected to the building
or structure disconnecting means and to the grounding electrode(s). The equipment grounding conductor shall be used
for grounding or bonding of equipment, structures, or frames
required to be grounded or bonded. The equipment grounding conductor shall be sized in accordance with 250.122. Any
installed grounded conductor shall not be connected to the
equipment grounding conductor or to the grounding electrode(s).



Exception No. 1: For installations made in compliance with previous
editions of this Code that permitted such connection, the grounded
conductor run with the supply to the building or structure shall be
permitted to serve as the ground-fault return path if all of the following
requirements continue to be met:



(1) An equipment grounding conductor is not run with the supply to
the building or structure.



(2) There are no continuous metallic paths bonded to the grounding
system in each building or structure involved.



(3) Ground-fault protection of equipment has not been installed on
the supply side of the feeder(s).



If the grounded conductor is used for grounding in accordance with
the provision of this exception, the size of the grounded conductor shall
not be smaller than the larger of either of the following:



(1) That required by 220.61



(2) That required by 250.122




The current state of this section was reached in the 2008 NEC, which forbade new construction from using the feeder neutral to provide ground for the fed system. (Your choices now are to provide a separate ground wire, which is what is normally done, or use a distribution transformer to create a separately derived system for the fed building, which has its own N-G bond.) Many of the installations that fall under the current exception were installed prior to the 1999 NEC, which is the first edition that forbade parallel current paths between the structures involved.







share|improve this answer












share|improve this answer



share|improve this answer










answered 1 hour ago









ThreePhaseEel

28.1k104487




28.1k104487











  • I agree with 1999 as the first required isolation of netural from ground.
    – Ed Beal
    53 mins ago
















  • I agree with 1999 as the first required isolation of netural from ground.
    – Ed Beal
    53 mins ago















I agree with 1999 as the first required isolation of netural from ground.
– Ed Beal
53 mins ago




I agree with 1999 as the first required isolation of netural from ground.
– Ed Beal
53 mins ago










Ted Friel is a new contributor. Be nice, and check out our Code of Conduct.









 

draft saved


draft discarded


















Ted Friel is a new contributor. Be nice, and check out our Code of Conduct.












Ted Friel is a new contributor. Be nice, and check out our Code of Conduct.











Ted Friel is a new contributor. Be nice, and check out our Code of Conduct.













 


draft saved


draft discarded














StackExchange.ready(
function ()
StackExchange.openid.initPostLogin('.new-post-login', 'https%3a%2f%2fdiy.stackexchange.com%2fquestions%2f149477%2fwhen-did-the-nec-code-start-to-require-the-separation-of-neutral-and-ground-bus%23new-answer', 'question_page');

);

Post as a guest













































































Comments

Popular posts from this blog

What does second last employer means? [closed]

List of Gilmore Girls characters

Confectionery