when did the NEC code start to require the separation of neutral and ground bus bars after main disconnect
Clash Royale CLAN TAG#URR8PPP
.everyoneloves__top-leaderboard:empty,.everyoneloves__mid-leaderboard:empty margin-bottom:0;
up vote
1
down vote
favorite
you gave the answer below to the question of the requirement for separate bus bars after the main disconnect box ... my question is ...
in what year did the NEC code start to require this separation?
what is the code #?
There are supposed to be two bus bars in every panel. One for neutrals, and one for grounds.
In the main panel ONLY, they are to be bonded together. This is what references your electrical system to earth voltage. It must only be done one place in a system.
Because of the required bond in the main panel, a great many electricians conclude that there is no difference between neutral and ground in the main panel since the N-G bond is right there. And they simply spam all neutrals and grounds onto the same bus. That logic is actually... reasonable... in the main panel.
However... If you want to be a precise and competent worker, then you separate them always, as if every panel were a subpanel, and let the neutral-ground bond do its job
subpanel
New contributor
Ted Friel is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
Check out our Code of Conduct.
add a comment |Â
up vote
1
down vote
favorite
you gave the answer below to the question of the requirement for separate bus bars after the main disconnect box ... my question is ...
in what year did the NEC code start to require this separation?
what is the code #?
There are supposed to be two bus bars in every panel. One for neutrals, and one for grounds.
In the main panel ONLY, they are to be bonded together. This is what references your electrical system to earth voltage. It must only be done one place in a system.
Because of the required bond in the main panel, a great many electricians conclude that there is no difference between neutral and ground in the main panel since the N-G bond is right there. And they simply spam all neutrals and grounds onto the same bus. That logic is actually... reasonable... in the main panel.
However... If you want to be a precise and competent worker, then you separate them always, as if every panel were a subpanel, and let the neutral-ground bond do its job
subpanel
New contributor
Ted Friel is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
Check out our Code of Conduct.
I completely agree with your last few paragraphs. I always separate neutral and ground, least to make converting a main panel to a sub a "snap". Of course I also work mainly in EMT, so there's no ground bar at all. .... Which explains why some panels don't come with them.
– Harper
3 mins ago
add a comment |Â
up vote
1
down vote
favorite
up vote
1
down vote
favorite
you gave the answer below to the question of the requirement for separate bus bars after the main disconnect box ... my question is ...
in what year did the NEC code start to require this separation?
what is the code #?
There are supposed to be two bus bars in every panel. One for neutrals, and one for grounds.
In the main panel ONLY, they are to be bonded together. This is what references your electrical system to earth voltage. It must only be done one place in a system.
Because of the required bond in the main panel, a great many electricians conclude that there is no difference between neutral and ground in the main panel since the N-G bond is right there. And they simply spam all neutrals and grounds onto the same bus. That logic is actually... reasonable... in the main panel.
However... If you want to be a precise and competent worker, then you separate them always, as if every panel were a subpanel, and let the neutral-ground bond do its job
subpanel
New contributor
Ted Friel is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
Check out our Code of Conduct.
you gave the answer below to the question of the requirement for separate bus bars after the main disconnect box ... my question is ...
in what year did the NEC code start to require this separation?
what is the code #?
There are supposed to be two bus bars in every panel. One for neutrals, and one for grounds.
In the main panel ONLY, they are to be bonded together. This is what references your electrical system to earth voltage. It must only be done one place in a system.
Because of the required bond in the main panel, a great many electricians conclude that there is no difference between neutral and ground in the main panel since the N-G bond is right there. And they simply spam all neutrals and grounds onto the same bus. That logic is actually... reasonable... in the main panel.
However... If you want to be a precise and competent worker, then you separate them always, as if every panel were a subpanel, and let the neutral-ground bond do its job
subpanel
subpanel
New contributor
Ted Friel is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
Check out our Code of Conduct.
New contributor
Ted Friel is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
Check out our Code of Conduct.
New contributor
Ted Friel is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
Check out our Code of Conduct.
asked 1 hour ago
Ted Friel
61
61
New contributor
Ted Friel is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
Check out our Code of Conduct.
New contributor
Ted Friel is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
Check out our Code of Conduct.
Ted Friel is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
Check out our Code of Conduct.
I completely agree with your last few paragraphs. I always separate neutral and ground, least to make converting a main panel to a sub a "snap". Of course I also work mainly in EMT, so there's no ground bar at all. .... Which explains why some panels don't come with them.
– Harper
3 mins ago
add a comment |Â
I completely agree with your last few paragraphs. I always separate neutral and ground, least to make converting a main panel to a sub a "snap". Of course I also work mainly in EMT, so there's no ground bar at all. .... Which explains why some panels don't come with them.
– Harper
3 mins ago
I completely agree with your last few paragraphs. I always separate neutral and ground, least to make converting a main panel to a sub a "snap". Of course I also work mainly in EMT, so there's no ground bar at all. .... Which explains why some panels don't come with them.
– Harper
3 mins ago
I completely agree with your last few paragraphs. I always separate neutral and ground, least to make converting a main panel to a sub a "snap". Of course I also work mainly in EMT, so there's no ground bar at all. .... Which explains why some panels don't come with them.
– Harper
3 mins ago
add a comment |Â
1 Answer
1
active
oldest
votes
up vote
2
down vote
You're after NEC 250.32(B)(1)
The applicable NEC section is 250.32(B)(1), which reads as follows ("equipment grounding conductor" = "ground" and "grounded conductor" = "neutral" for us, and exception 2 is irrelevant for this):
(1) Supplied by a Feeder or Branch Circuit. An equipment
grounding conductor, as described in 250.118, shall be run
with the supply conductors and be connected to the building
or structure disconnecting means and to the grounding electrode(s). The equipment grounding conductor shall be used
for grounding or bonding of equipment, structures, or frames
required to be grounded or bonded. The equipment grounding conductor shall be sized in accordance with 250.122. Any
installed grounded conductor shall not be connected to the
equipment grounding conductor or to the grounding electrode(s).
Exception No. 1: For installations made in compliance with previous
editions of this Code that permitted such connection, the grounded
conductor run with the supply to the building or structure shall be
permitted to serve as the ground-fault return path if all of the following
requirements continue to be met:
(1) An equipment grounding conductor is not run with the supply to
the building or structure.
(2) There are no continuous metallic paths bonded to the grounding
system in each building or structure involved.
(3) Ground-fault protection of equipment has not been installed on
the supply side of the feeder(s).
If the grounded conductor is used for grounding in accordance with
the provision of this exception, the size of the grounded conductor shall
not be smaller than the larger of either of the following:
(1) That required by 220.61
(2) That required by 250.122
The current state of this section was reached in the 2008 NEC, which forbade new construction from using the feeder neutral to provide ground for the fed system. (Your choices now are to provide a separate ground wire, which is what is normally done, or use a distribution transformer to create a separately derived system for the fed building, which has its own N-G bond.) Many of the installations that fall under the current exception were installed prior to the 1999 NEC, which is the first edition that forbade parallel current paths between the structures involved.
I agree with 1999 as the first required isolation of netural from ground.
– Ed Beal
53 mins ago
add a comment |Â
1 Answer
1
active
oldest
votes
1 Answer
1
active
oldest
votes
active
oldest
votes
active
oldest
votes
up vote
2
down vote
You're after NEC 250.32(B)(1)
The applicable NEC section is 250.32(B)(1), which reads as follows ("equipment grounding conductor" = "ground" and "grounded conductor" = "neutral" for us, and exception 2 is irrelevant for this):
(1) Supplied by a Feeder or Branch Circuit. An equipment
grounding conductor, as described in 250.118, shall be run
with the supply conductors and be connected to the building
or structure disconnecting means and to the grounding electrode(s). The equipment grounding conductor shall be used
for grounding or bonding of equipment, structures, or frames
required to be grounded or bonded. The equipment grounding conductor shall be sized in accordance with 250.122. Any
installed grounded conductor shall not be connected to the
equipment grounding conductor or to the grounding electrode(s).
Exception No. 1: For installations made in compliance with previous
editions of this Code that permitted such connection, the grounded
conductor run with the supply to the building or structure shall be
permitted to serve as the ground-fault return path if all of the following
requirements continue to be met:
(1) An equipment grounding conductor is not run with the supply to
the building or structure.
(2) There are no continuous metallic paths bonded to the grounding
system in each building or structure involved.
(3) Ground-fault protection of equipment has not been installed on
the supply side of the feeder(s).
If the grounded conductor is used for grounding in accordance with
the provision of this exception, the size of the grounded conductor shall
not be smaller than the larger of either of the following:
(1) That required by 220.61
(2) That required by 250.122
The current state of this section was reached in the 2008 NEC, which forbade new construction from using the feeder neutral to provide ground for the fed system. (Your choices now are to provide a separate ground wire, which is what is normally done, or use a distribution transformer to create a separately derived system for the fed building, which has its own N-G bond.) Many of the installations that fall under the current exception were installed prior to the 1999 NEC, which is the first edition that forbade parallel current paths between the structures involved.
I agree with 1999 as the first required isolation of netural from ground.
– Ed Beal
53 mins ago
add a comment |Â
up vote
2
down vote
You're after NEC 250.32(B)(1)
The applicable NEC section is 250.32(B)(1), which reads as follows ("equipment grounding conductor" = "ground" and "grounded conductor" = "neutral" for us, and exception 2 is irrelevant for this):
(1) Supplied by a Feeder or Branch Circuit. An equipment
grounding conductor, as described in 250.118, shall be run
with the supply conductors and be connected to the building
or structure disconnecting means and to the grounding electrode(s). The equipment grounding conductor shall be used
for grounding or bonding of equipment, structures, or frames
required to be grounded or bonded. The equipment grounding conductor shall be sized in accordance with 250.122. Any
installed grounded conductor shall not be connected to the
equipment grounding conductor or to the grounding electrode(s).
Exception No. 1: For installations made in compliance with previous
editions of this Code that permitted such connection, the grounded
conductor run with the supply to the building or structure shall be
permitted to serve as the ground-fault return path if all of the following
requirements continue to be met:
(1) An equipment grounding conductor is not run with the supply to
the building or structure.
(2) There are no continuous metallic paths bonded to the grounding
system in each building or structure involved.
(3) Ground-fault protection of equipment has not been installed on
the supply side of the feeder(s).
If the grounded conductor is used for grounding in accordance with
the provision of this exception, the size of the grounded conductor shall
not be smaller than the larger of either of the following:
(1) That required by 220.61
(2) That required by 250.122
The current state of this section was reached in the 2008 NEC, which forbade new construction from using the feeder neutral to provide ground for the fed system. (Your choices now are to provide a separate ground wire, which is what is normally done, or use a distribution transformer to create a separately derived system for the fed building, which has its own N-G bond.) Many of the installations that fall under the current exception were installed prior to the 1999 NEC, which is the first edition that forbade parallel current paths between the structures involved.
I agree with 1999 as the first required isolation of netural from ground.
– Ed Beal
53 mins ago
add a comment |Â
up vote
2
down vote
up vote
2
down vote
You're after NEC 250.32(B)(1)
The applicable NEC section is 250.32(B)(1), which reads as follows ("equipment grounding conductor" = "ground" and "grounded conductor" = "neutral" for us, and exception 2 is irrelevant for this):
(1) Supplied by a Feeder or Branch Circuit. An equipment
grounding conductor, as described in 250.118, shall be run
with the supply conductors and be connected to the building
or structure disconnecting means and to the grounding electrode(s). The equipment grounding conductor shall be used
for grounding or bonding of equipment, structures, or frames
required to be grounded or bonded. The equipment grounding conductor shall be sized in accordance with 250.122. Any
installed grounded conductor shall not be connected to the
equipment grounding conductor or to the grounding electrode(s).
Exception No. 1: For installations made in compliance with previous
editions of this Code that permitted such connection, the grounded
conductor run with the supply to the building or structure shall be
permitted to serve as the ground-fault return path if all of the following
requirements continue to be met:
(1) An equipment grounding conductor is not run with the supply to
the building or structure.
(2) There are no continuous metallic paths bonded to the grounding
system in each building or structure involved.
(3) Ground-fault protection of equipment has not been installed on
the supply side of the feeder(s).
If the grounded conductor is used for grounding in accordance with
the provision of this exception, the size of the grounded conductor shall
not be smaller than the larger of either of the following:
(1) That required by 220.61
(2) That required by 250.122
The current state of this section was reached in the 2008 NEC, which forbade new construction from using the feeder neutral to provide ground for the fed system. (Your choices now are to provide a separate ground wire, which is what is normally done, or use a distribution transformer to create a separately derived system for the fed building, which has its own N-G bond.) Many of the installations that fall under the current exception were installed prior to the 1999 NEC, which is the first edition that forbade parallel current paths between the structures involved.
You're after NEC 250.32(B)(1)
The applicable NEC section is 250.32(B)(1), which reads as follows ("equipment grounding conductor" = "ground" and "grounded conductor" = "neutral" for us, and exception 2 is irrelevant for this):
(1) Supplied by a Feeder or Branch Circuit. An equipment
grounding conductor, as described in 250.118, shall be run
with the supply conductors and be connected to the building
or structure disconnecting means and to the grounding electrode(s). The equipment grounding conductor shall be used
for grounding or bonding of equipment, structures, or frames
required to be grounded or bonded. The equipment grounding conductor shall be sized in accordance with 250.122. Any
installed grounded conductor shall not be connected to the
equipment grounding conductor or to the grounding electrode(s).
Exception No. 1: For installations made in compliance with previous
editions of this Code that permitted such connection, the grounded
conductor run with the supply to the building or structure shall be
permitted to serve as the ground-fault return path if all of the following
requirements continue to be met:
(1) An equipment grounding conductor is not run with the supply to
the building or structure.
(2) There are no continuous metallic paths bonded to the grounding
system in each building or structure involved.
(3) Ground-fault protection of equipment has not been installed on
the supply side of the feeder(s).
If the grounded conductor is used for grounding in accordance with
the provision of this exception, the size of the grounded conductor shall
not be smaller than the larger of either of the following:
(1) That required by 220.61
(2) That required by 250.122
The current state of this section was reached in the 2008 NEC, which forbade new construction from using the feeder neutral to provide ground for the fed system. (Your choices now are to provide a separate ground wire, which is what is normally done, or use a distribution transformer to create a separately derived system for the fed building, which has its own N-G bond.) Many of the installations that fall under the current exception were installed prior to the 1999 NEC, which is the first edition that forbade parallel current paths between the structures involved.
answered 1 hour ago
ThreePhaseEel
28.1k104487
28.1k104487
I agree with 1999 as the first required isolation of netural from ground.
– Ed Beal
53 mins ago
add a comment |Â
I agree with 1999 as the first required isolation of netural from ground.
– Ed Beal
53 mins ago
I agree with 1999 as the first required isolation of netural from ground.
– Ed Beal
53 mins ago
I agree with 1999 as the first required isolation of netural from ground.
– Ed Beal
53 mins ago
add a comment |Â
Ted Friel is a new contributor. Be nice, and check out our Code of Conduct.
Ted Friel is a new contributor. Be nice, and check out our Code of Conduct.
Ted Friel is a new contributor. Be nice, and check out our Code of Conduct.
Ted Friel is a new contributor. Be nice, and check out our Code of Conduct.
Sign up or log in
StackExchange.ready(function ()
StackExchange.helpers.onClickDraftSave('#login-link');
);
Sign up using Google
Sign up using Facebook
Sign up using Email and Password
Post as a guest
StackExchange.ready(
function ()
StackExchange.openid.initPostLogin('.new-post-login', 'https%3a%2f%2fdiy.stackexchange.com%2fquestions%2f149477%2fwhen-did-the-nec-code-start-to-require-the-separation-of-neutral-and-ground-bus%23new-answer', 'question_page');
);
Post as a guest
Sign up or log in
StackExchange.ready(function ()
StackExchange.helpers.onClickDraftSave('#login-link');
);
Sign up using Google
Sign up using Facebook
Sign up using Email and Password
Post as a guest
Sign up or log in
StackExchange.ready(function ()
StackExchange.helpers.onClickDraftSave('#login-link');
);
Sign up using Google
Sign up using Facebook
Sign up using Email and Password
Post as a guest
Sign up or log in
StackExchange.ready(function ()
StackExchange.helpers.onClickDraftSave('#login-link');
);
Sign up using Google
Sign up using Facebook
Sign up using Email and Password
Sign up using Google
Sign up using Facebook
Sign up using Email and Password
I completely agree with your last few paragraphs. I always separate neutral and ground, least to make converting a main panel to a sub a "snap". Of course I also work mainly in EMT, so there's no ground bar at all. .... Which explains why some panels don't come with them.
– Harper
3 mins ago