What is the precise definition of working independently?
Clash Royale CLAN TAG#URR8PPP
.everyoneloves__top-leaderboard:empty,.everyoneloves__mid-leaderboard:empty margin-bottom:0;
up vote
2
down vote
favorite
I am software developer. I have heard a lot of managers say that one of the virtues they seek in a good engineer is "Independent execution of tasks". Assuming that there is a mature definition of this virtue, considering the fact that so many managers keep telling this, What exactly is the meaning of this? What aspects of a job do they seek independence in?
Is it the code development they are talking about?
Is it the complete project management that they expect the engineer/developer to do?
Is it the business decision too that they expect the engineer to take?
Or is there something else or more to it. Would like to have some clarity on this.
career-development work-experience
 |Â
show 1 more comment
up vote
2
down vote
favorite
I am software developer. I have heard a lot of managers say that one of the virtues they seek in a good engineer is "Independent execution of tasks". Assuming that there is a mature definition of this virtue, considering the fact that so many managers keep telling this, What exactly is the meaning of this? What aspects of a job do they seek independence in?
Is it the code development they are talking about?
Is it the complete project management that they expect the engineer/developer to do?
Is it the business decision too that they expect the engineer to take?
Or is there something else or more to it. Would like to have some clarity on this.
career-development work-experience
4
"Assuming that there is a mature definition of this virtue" - big assumption there ;)
– Oded
Jan 16 '15 at 14:51
Maybe I shouldn't have answered since I didn't provide a precise definition.. but there it is. I'll delete my answer if it comes to that
– Brian
Jan 16 '15 at 14:58
4
Pro tip: if this requirement is listed in a job description for a job that you get some kind of interview for, make sure to ask them what do they think "independent execution of tasks" means.
– Kai
Jan 16 '15 at 16:35
It just someone who can do the job without having to be closely supervised i.e. someone who can do the job with little to no supervision.
– Vietnhi Phuvan
Jan 16 '15 at 17:46
1
It means you get it without always requiring a precise definition. Otherwise, they would look for people who can follow explicit instructions without needing to figure things out for themselves. They're ambiguous for a reason.
– user8365
Jan 16 '15 at 22:40
 |Â
show 1 more comment
up vote
2
down vote
favorite
up vote
2
down vote
favorite
I am software developer. I have heard a lot of managers say that one of the virtues they seek in a good engineer is "Independent execution of tasks". Assuming that there is a mature definition of this virtue, considering the fact that so many managers keep telling this, What exactly is the meaning of this? What aspects of a job do they seek independence in?
Is it the code development they are talking about?
Is it the complete project management that they expect the engineer/developer to do?
Is it the business decision too that they expect the engineer to take?
Or is there something else or more to it. Would like to have some clarity on this.
career-development work-experience
I am software developer. I have heard a lot of managers say that one of the virtues they seek in a good engineer is "Independent execution of tasks". Assuming that there is a mature definition of this virtue, considering the fact that so many managers keep telling this, What exactly is the meaning of this? What aspects of a job do they seek independence in?
Is it the code development they are talking about?
Is it the complete project management that they expect the engineer/developer to do?
Is it the business decision too that they expect the engineer to take?
Or is there something else or more to it. Would like to have some clarity on this.
career-development work-experience
asked Jan 16 '15 at 14:48


Sushant
178149
178149
4
"Assuming that there is a mature definition of this virtue" - big assumption there ;)
– Oded
Jan 16 '15 at 14:51
Maybe I shouldn't have answered since I didn't provide a precise definition.. but there it is. I'll delete my answer if it comes to that
– Brian
Jan 16 '15 at 14:58
4
Pro tip: if this requirement is listed in a job description for a job that you get some kind of interview for, make sure to ask them what do they think "independent execution of tasks" means.
– Kai
Jan 16 '15 at 16:35
It just someone who can do the job without having to be closely supervised i.e. someone who can do the job with little to no supervision.
– Vietnhi Phuvan
Jan 16 '15 at 17:46
1
It means you get it without always requiring a precise definition. Otherwise, they would look for people who can follow explicit instructions without needing to figure things out for themselves. They're ambiguous for a reason.
– user8365
Jan 16 '15 at 22:40
 |Â
show 1 more comment
4
"Assuming that there is a mature definition of this virtue" - big assumption there ;)
– Oded
Jan 16 '15 at 14:51
Maybe I shouldn't have answered since I didn't provide a precise definition.. but there it is. I'll delete my answer if it comes to that
– Brian
Jan 16 '15 at 14:58
4
Pro tip: if this requirement is listed in a job description for a job that you get some kind of interview for, make sure to ask them what do they think "independent execution of tasks" means.
– Kai
Jan 16 '15 at 16:35
It just someone who can do the job without having to be closely supervised i.e. someone who can do the job with little to no supervision.
– Vietnhi Phuvan
Jan 16 '15 at 17:46
1
It means you get it without always requiring a precise definition. Otherwise, they would look for people who can follow explicit instructions without needing to figure things out for themselves. They're ambiguous for a reason.
– user8365
Jan 16 '15 at 22:40
4
4
"Assuming that there is a mature definition of this virtue" - big assumption there ;)
– Oded
Jan 16 '15 at 14:51
"Assuming that there is a mature definition of this virtue" - big assumption there ;)
– Oded
Jan 16 '15 at 14:51
Maybe I shouldn't have answered since I didn't provide a precise definition.. but there it is. I'll delete my answer if it comes to that
– Brian
Jan 16 '15 at 14:58
Maybe I shouldn't have answered since I didn't provide a precise definition.. but there it is. I'll delete my answer if it comes to that
– Brian
Jan 16 '15 at 14:58
4
4
Pro tip: if this requirement is listed in a job description for a job that you get some kind of interview for, make sure to ask them what do they think "independent execution of tasks" means.
– Kai
Jan 16 '15 at 16:35
Pro tip: if this requirement is listed in a job description for a job that you get some kind of interview for, make sure to ask them what do they think "independent execution of tasks" means.
– Kai
Jan 16 '15 at 16:35
It just someone who can do the job without having to be closely supervised i.e. someone who can do the job with little to no supervision.
– Vietnhi Phuvan
Jan 16 '15 at 17:46
It just someone who can do the job without having to be closely supervised i.e. someone who can do the job with little to no supervision.
– Vietnhi Phuvan
Jan 16 '15 at 17:46
1
1
It means you get it without always requiring a precise definition. Otherwise, they would look for people who can follow explicit instructions without needing to figure things out for themselves. They're ambiguous for a reason.
– user8365
Jan 16 '15 at 22:40
It means you get it without always requiring a precise definition. Otherwise, they would look for people who can follow explicit instructions without needing to figure things out for themselves. They're ambiguous for a reason.
– user8365
Jan 16 '15 at 22:40
 |Â
show 1 more comment
3 Answers
3
active
oldest
votes
up vote
7
down vote
accepted
I think this goes hand-in-hand with the "motivated self-starter" and "shows initiative" that show up on job descriptions on the job boards out there.
My feeling on this, is that the managers want an employee they can trust. Someone they don't have to babysit and gets their job done. Someone who can be assigned tasks and gets them done on time and on budget.
As to how they spot this? That depends on when they look for it I guess. If this is after the employee has been hired, then I can see management watching the new hire to see if they're going to pan out. During the interview? That's someone with more skills than I have.
2
+1 - the scope of it certainly depends on the context, but the main idea of "someone I don't need to babysit" is key.
– Telastyn
Jan 16 '15 at 15:05
suggest improvements |Â
up vote
6
down vote
Typically Independent execution of tasks is fairly narrow in scope.
This doesn't mean you should run off an your own projects without consulting the business or just run off and do whatever you think is best at the moment.
Instead what this typically means is when you're assigned a task(s) you take ownership and don't require constant assistance or supervision to complete that task(s). More or less, once I assign something to you with sufficient details to accomplish it no further involvement is needed. In addition I need to be able to trust you to be reliable in delivering at the expected quality or better, on time, and within budget.
(For short, they want someone who will do what their asked to do reliably without needing constant supervision)
+1 for the "sufficient details" aspect. Key point I missed
– Brian
Jan 16 '15 at 15:05
I would expect someone who is independent to complete the task even if there are not sufficient details. I would expect him or her to proactively seek out the missing information to be able to complete the task.
– Eric
Jan 16 '15 at 22:24
@Eric of coarse, however; there are times critical details are not passed on to the individual that ultimately ensure it will not be done correctly / on time. (I can't ask questions about things I don't know I don't know) Needing to clarify details, locate information, etc is all perfectly fine, but when someone forgets critical details when providing you the expectations / requirements of the project things are probably not going to turn out well)
– RualStorge
Feb 11 '15 at 17:24
suggest improvements |Â
up vote
1
down vote
An "independent" worker usually means someone who doesn't need to be led by the hand every step of the way- Someone who can handle some troubleshooting on their own. It's not a good sign if the rest of the team spends more time helping you than the other way around, with the exception of ramping you up... To put it bluntly, they don't want a liability.
suggest improvements |Â
StackExchange.ready(function ()
$("#show-editor-button input, #show-editor-button button").click(function ()
var showEditor = function()
$("#show-editor-button").hide();
$("#post-form").removeClass("dno");
StackExchange.editor.finallyInit();
;
var useFancy = $(this).data('confirm-use-fancy');
if(useFancy == 'True')
var popupTitle = $(this).data('confirm-fancy-title');
var popupBody = $(this).data('confirm-fancy-body');
var popupAccept = $(this).data('confirm-fancy-accept-button');
$(this).loadPopup(
url: '/post/self-answer-popup',
loaded: function(popup)
var pTitle = $(popup).find('h2');
var pBody = $(popup).find('.popup-body');
var pSubmit = $(popup).find('.popup-submit');
pTitle.text(popupTitle);
pBody.html(popupBody);
pSubmit.val(popupAccept).click(showEditor);
)
else
var confirmText = $(this).data('confirm-text');
if (confirmText ? confirm(confirmText) : true)
showEditor();
);
);
3 Answers
3
active
oldest
votes
3 Answers
3
active
oldest
votes
active
oldest
votes
active
oldest
votes
up vote
7
down vote
accepted
I think this goes hand-in-hand with the "motivated self-starter" and "shows initiative" that show up on job descriptions on the job boards out there.
My feeling on this, is that the managers want an employee they can trust. Someone they don't have to babysit and gets their job done. Someone who can be assigned tasks and gets them done on time and on budget.
As to how they spot this? That depends on when they look for it I guess. If this is after the employee has been hired, then I can see management watching the new hire to see if they're going to pan out. During the interview? That's someone with more skills than I have.
2
+1 - the scope of it certainly depends on the context, but the main idea of "someone I don't need to babysit" is key.
– Telastyn
Jan 16 '15 at 15:05
suggest improvements |Â
up vote
7
down vote
accepted
I think this goes hand-in-hand with the "motivated self-starter" and "shows initiative" that show up on job descriptions on the job boards out there.
My feeling on this, is that the managers want an employee they can trust. Someone they don't have to babysit and gets their job done. Someone who can be assigned tasks and gets them done on time and on budget.
As to how they spot this? That depends on when they look for it I guess. If this is after the employee has been hired, then I can see management watching the new hire to see if they're going to pan out. During the interview? That's someone with more skills than I have.
2
+1 - the scope of it certainly depends on the context, but the main idea of "someone I don't need to babysit" is key.
– Telastyn
Jan 16 '15 at 15:05
suggest improvements |Â
up vote
7
down vote
accepted
up vote
7
down vote
accepted
I think this goes hand-in-hand with the "motivated self-starter" and "shows initiative" that show up on job descriptions on the job boards out there.
My feeling on this, is that the managers want an employee they can trust. Someone they don't have to babysit and gets their job done. Someone who can be assigned tasks and gets them done on time and on budget.
As to how they spot this? That depends on when they look for it I guess. If this is after the employee has been hired, then I can see management watching the new hire to see if they're going to pan out. During the interview? That's someone with more skills than I have.
I think this goes hand-in-hand with the "motivated self-starter" and "shows initiative" that show up on job descriptions on the job boards out there.
My feeling on this, is that the managers want an employee they can trust. Someone they don't have to babysit and gets their job done. Someone who can be assigned tasks and gets them done on time and on budget.
As to how they spot this? That depends on when they look for it I guess. If this is after the employee has been hired, then I can see management watching the new hire to see if they're going to pan out. During the interview? That's someone with more skills than I have.
answered Jan 16 '15 at 14:57
Brian
1,408922
1,408922
2
+1 - the scope of it certainly depends on the context, but the main idea of "someone I don't need to babysit" is key.
– Telastyn
Jan 16 '15 at 15:05
suggest improvements |Â
2
+1 - the scope of it certainly depends on the context, but the main idea of "someone I don't need to babysit" is key.
– Telastyn
Jan 16 '15 at 15:05
2
2
+1 - the scope of it certainly depends on the context, but the main idea of "someone I don't need to babysit" is key.
– Telastyn
Jan 16 '15 at 15:05
+1 - the scope of it certainly depends on the context, but the main idea of "someone I don't need to babysit" is key.
– Telastyn
Jan 16 '15 at 15:05
suggest improvements |Â
up vote
6
down vote
Typically Independent execution of tasks is fairly narrow in scope.
This doesn't mean you should run off an your own projects without consulting the business or just run off and do whatever you think is best at the moment.
Instead what this typically means is when you're assigned a task(s) you take ownership and don't require constant assistance or supervision to complete that task(s). More or less, once I assign something to you with sufficient details to accomplish it no further involvement is needed. In addition I need to be able to trust you to be reliable in delivering at the expected quality or better, on time, and within budget.
(For short, they want someone who will do what their asked to do reliably without needing constant supervision)
+1 for the "sufficient details" aspect. Key point I missed
– Brian
Jan 16 '15 at 15:05
I would expect someone who is independent to complete the task even if there are not sufficient details. I would expect him or her to proactively seek out the missing information to be able to complete the task.
– Eric
Jan 16 '15 at 22:24
@Eric of coarse, however; there are times critical details are not passed on to the individual that ultimately ensure it will not be done correctly / on time. (I can't ask questions about things I don't know I don't know) Needing to clarify details, locate information, etc is all perfectly fine, but when someone forgets critical details when providing you the expectations / requirements of the project things are probably not going to turn out well)
– RualStorge
Feb 11 '15 at 17:24
suggest improvements |Â
up vote
6
down vote
Typically Independent execution of tasks is fairly narrow in scope.
This doesn't mean you should run off an your own projects without consulting the business or just run off and do whatever you think is best at the moment.
Instead what this typically means is when you're assigned a task(s) you take ownership and don't require constant assistance or supervision to complete that task(s). More or less, once I assign something to you with sufficient details to accomplish it no further involvement is needed. In addition I need to be able to trust you to be reliable in delivering at the expected quality or better, on time, and within budget.
(For short, they want someone who will do what their asked to do reliably without needing constant supervision)
+1 for the "sufficient details" aspect. Key point I missed
– Brian
Jan 16 '15 at 15:05
I would expect someone who is independent to complete the task even if there are not sufficient details. I would expect him or her to proactively seek out the missing information to be able to complete the task.
– Eric
Jan 16 '15 at 22:24
@Eric of coarse, however; there are times critical details are not passed on to the individual that ultimately ensure it will not be done correctly / on time. (I can't ask questions about things I don't know I don't know) Needing to clarify details, locate information, etc is all perfectly fine, but when someone forgets critical details when providing you the expectations / requirements of the project things are probably not going to turn out well)
– RualStorge
Feb 11 '15 at 17:24
suggest improvements |Â
up vote
6
down vote
up vote
6
down vote
Typically Independent execution of tasks is fairly narrow in scope.
This doesn't mean you should run off an your own projects without consulting the business or just run off and do whatever you think is best at the moment.
Instead what this typically means is when you're assigned a task(s) you take ownership and don't require constant assistance or supervision to complete that task(s). More or less, once I assign something to you with sufficient details to accomplish it no further involvement is needed. In addition I need to be able to trust you to be reliable in delivering at the expected quality or better, on time, and within budget.
(For short, they want someone who will do what their asked to do reliably without needing constant supervision)
Typically Independent execution of tasks is fairly narrow in scope.
This doesn't mean you should run off an your own projects without consulting the business or just run off and do whatever you think is best at the moment.
Instead what this typically means is when you're assigned a task(s) you take ownership and don't require constant assistance or supervision to complete that task(s). More or less, once I assign something to you with sufficient details to accomplish it no further involvement is needed. In addition I need to be able to trust you to be reliable in delivering at the expected quality or better, on time, and within budget.
(For short, they want someone who will do what their asked to do reliably without needing constant supervision)
answered Jan 16 '15 at 15:01
RualStorge
9,5372231
9,5372231
+1 for the "sufficient details" aspect. Key point I missed
– Brian
Jan 16 '15 at 15:05
I would expect someone who is independent to complete the task even if there are not sufficient details. I would expect him or her to proactively seek out the missing information to be able to complete the task.
– Eric
Jan 16 '15 at 22:24
@Eric of coarse, however; there are times critical details are not passed on to the individual that ultimately ensure it will not be done correctly / on time. (I can't ask questions about things I don't know I don't know) Needing to clarify details, locate information, etc is all perfectly fine, but when someone forgets critical details when providing you the expectations / requirements of the project things are probably not going to turn out well)
– RualStorge
Feb 11 '15 at 17:24
suggest improvements |Â
+1 for the "sufficient details" aspect. Key point I missed
– Brian
Jan 16 '15 at 15:05
I would expect someone who is independent to complete the task even if there are not sufficient details. I would expect him or her to proactively seek out the missing information to be able to complete the task.
– Eric
Jan 16 '15 at 22:24
@Eric of coarse, however; there are times critical details are not passed on to the individual that ultimately ensure it will not be done correctly / on time. (I can't ask questions about things I don't know I don't know) Needing to clarify details, locate information, etc is all perfectly fine, but when someone forgets critical details when providing you the expectations / requirements of the project things are probably not going to turn out well)
– RualStorge
Feb 11 '15 at 17:24
+1 for the "sufficient details" aspect. Key point I missed
– Brian
Jan 16 '15 at 15:05
+1 for the "sufficient details" aspect. Key point I missed
– Brian
Jan 16 '15 at 15:05
I would expect someone who is independent to complete the task even if there are not sufficient details. I would expect him or her to proactively seek out the missing information to be able to complete the task.
– Eric
Jan 16 '15 at 22:24
I would expect someone who is independent to complete the task even if there are not sufficient details. I would expect him or her to proactively seek out the missing information to be able to complete the task.
– Eric
Jan 16 '15 at 22:24
@Eric of coarse, however; there are times critical details are not passed on to the individual that ultimately ensure it will not be done correctly / on time. (I can't ask questions about things I don't know I don't know) Needing to clarify details, locate information, etc is all perfectly fine, but when someone forgets critical details when providing you the expectations / requirements of the project things are probably not going to turn out well)
– RualStorge
Feb 11 '15 at 17:24
@Eric of coarse, however; there are times critical details are not passed on to the individual that ultimately ensure it will not be done correctly / on time. (I can't ask questions about things I don't know I don't know) Needing to clarify details, locate information, etc is all perfectly fine, but when someone forgets critical details when providing you the expectations / requirements of the project things are probably not going to turn out well)
– RualStorge
Feb 11 '15 at 17:24
suggest improvements |Â
up vote
1
down vote
An "independent" worker usually means someone who doesn't need to be led by the hand every step of the way- Someone who can handle some troubleshooting on their own. It's not a good sign if the rest of the team spends more time helping you than the other way around, with the exception of ramping you up... To put it bluntly, they don't want a liability.
suggest improvements |Â
up vote
1
down vote
An "independent" worker usually means someone who doesn't need to be led by the hand every step of the way- Someone who can handle some troubleshooting on their own. It's not a good sign if the rest of the team spends more time helping you than the other way around, with the exception of ramping you up... To put it bluntly, they don't want a liability.
suggest improvements |Â
up vote
1
down vote
up vote
1
down vote
An "independent" worker usually means someone who doesn't need to be led by the hand every step of the way- Someone who can handle some troubleshooting on their own. It's not a good sign if the rest of the team spends more time helping you than the other way around, with the exception of ramping you up... To put it bluntly, they don't want a liability.
An "independent" worker usually means someone who doesn't need to be led by the hand every step of the way- Someone who can handle some troubleshooting on their own. It's not a good sign if the rest of the team spends more time helping you than the other way around, with the exception of ramping you up... To put it bluntly, they don't want a liability.
answered Jan 18 '15 at 4:43
pixie
112
112
suggest improvements |Â
suggest improvements |Â
Sign up or log in
StackExchange.ready(function ()
StackExchange.helpers.onClickDraftSave('#login-link');
);
Sign up using Google
Sign up using Facebook
Sign up using Email and Password
Post as a guest
StackExchange.ready(
function ()
StackExchange.openid.initPostLogin('.new-post-login', 'https%3a%2f%2fworkplace.stackexchange.com%2fquestions%2f40396%2fwhat-is-the-precise-definition-of-working-independently%23new-answer', 'question_page');
);
Post as a guest
Sign up or log in
StackExchange.ready(function ()
StackExchange.helpers.onClickDraftSave('#login-link');
);
Sign up using Google
Sign up using Facebook
Sign up using Email and Password
Post as a guest
Sign up or log in
StackExchange.ready(function ()
StackExchange.helpers.onClickDraftSave('#login-link');
);
Sign up using Google
Sign up using Facebook
Sign up using Email and Password
Post as a guest
Sign up or log in
StackExchange.ready(function ()
StackExchange.helpers.onClickDraftSave('#login-link');
);
Sign up using Google
Sign up using Facebook
Sign up using Email and Password
Sign up using Google
Sign up using Facebook
Sign up using Email and Password
4
"Assuming that there is a mature definition of this virtue" - big assumption there ;)
– Oded
Jan 16 '15 at 14:51
Maybe I shouldn't have answered since I didn't provide a precise definition.. but there it is. I'll delete my answer if it comes to that
– Brian
Jan 16 '15 at 14:58
4
Pro tip: if this requirement is listed in a job description for a job that you get some kind of interview for, make sure to ask them what do they think "independent execution of tasks" means.
– Kai
Jan 16 '15 at 16:35
It just someone who can do the job without having to be closely supervised i.e. someone who can do the job with little to no supervision.
– Vietnhi Phuvan
Jan 16 '15 at 17:46
1
It means you get it without always requiring a precise definition. Otherwise, they would look for people who can follow explicit instructions without needing to figure things out for themselves. They're ambiguous for a reason.
– user8365
Jan 16 '15 at 22:40