up vote
1
down vote

favorite












I got a 3 month contract. I'm a subcontractor for a company that as an agreement with another company that's won a government bid. My 3 months are done tomorrow and the government company has said they really like me. They put out work for another 175 days which ends up being end of Dec 2016.



I'm not happy with the initial rate I accepted and am wondering if it's appropriate to negotiate the rate moving forward before signing the contract extension?







share|improve this question

























    up vote
    1
    down vote

    favorite












    I got a 3 month contract. I'm a subcontractor for a company that as an agreement with another company that's won a government bid. My 3 months are done tomorrow and the government company has said they really like me. They put out work for another 175 days which ends up being end of Dec 2016.



    I'm not happy with the initial rate I accepted and am wondering if it's appropriate to negotiate the rate moving forward before signing the contract extension?







    share|improve this question





















      up vote
      1
      down vote

      favorite









      up vote
      1
      down vote

      favorite











      I got a 3 month contract. I'm a subcontractor for a company that as an agreement with another company that's won a government bid. My 3 months are done tomorrow and the government company has said they really like me. They put out work for another 175 days which ends up being end of Dec 2016.



      I'm not happy with the initial rate I accepted and am wondering if it's appropriate to negotiate the rate moving forward before signing the contract extension?







      share|improve this question











      I got a 3 month contract. I'm a subcontractor for a company that as an agreement with another company that's won a government bid. My 3 months are done tomorrow and the government company has said they really like me. They put out work for another 175 days which ends up being end of Dec 2016.



      I'm not happy with the initial rate I accepted and am wondering if it's appropriate to negotiate the rate moving forward before signing the contract extension?









      share|improve this question










      share|improve this question




      share|improve this question









      asked Mar 31 '16 at 3:03









      Batman

      268211




      268211




















          3 Answers
          3






          active

          oldest

          votes

















          up vote
          3
          down vote














          wondering if it's appropriate to negotiate the rate moving forward before signing the contract extension?




          It's entirely appropriate, this is the only real time you can negotiate in. Be aware that you may price yourself out of a job, but the likelihood is high that you will get a raise if you don't ask for too much more. Reason being is that you have 3 months on the job already, know the people, earned some trust and will hit the ground running.






          share|improve this answer





















          • What would be a good justification I could tell them. Like if they say, "Well you agreed to the initial rate" I'm not sure how I'd respond
            – Batman
            Mar 31 '16 at 4:10






          • 1




            I would say it's a new situation, that is the price they would need to pay to continue my services. The original contract ended agreeably on all sides, but it ended.
            – Kilisi
            Mar 31 '16 at 4:17










          • Thank you, i'll give it a shot tomorrow and see how it goes.
            – Batman
            Mar 31 '16 at 4:42







          • 1




            that's pretty much up to you, if it was me I'd turn it down, and they'll either negotiate or not... but I'm not short on work. It's a judgement call, just because someone tells me they're honest doesn't put more money in my pocket and therefore doesn't impress me. So in my case it would be 'Well, sad to hear that, but I need to be making X per hour.' But like I said, I'm not desperate for work... you may have less leeway to take the hard line.
            – Kilisi
            Apr 3 '16 at 23:27







          • 1




            Makes sense. Thanks for your insight Kilisi :)
            – Batman
            Apr 4 '16 at 13:00

















          up vote
          1
          down vote













          The reason they liked you most probably, along with you producing a good outcome for whatever you are doing but you are doing it for cheaper than other they may hire. By trying to renegotiate your contract, you may be taking yourself out of the market. If you are sure that you are grossly underpaid, we are not talking about a few dollars per hour but 15-20% =, you can go to your company today and tell them that at the end of your initial contract period, you demand this much rate per hour, otherwise you are looking for a new opportunity. They may accept or they may say "good-bye.. nice was knowing you." If you are ready for that, you can negotiate your contract to your heart's content. It is the best thing about free market economy, unless you are living somewhere in deep Eastern Europe or (gasp) China






          share|improve this answer

















          • 1




            Well I have a few things going for me, I am a sub-sub-contractor. So it's Government > Comp A > Comp B > Me. They accidentally gave me the contract between Government and Comp A so I know that I'm making about 58% of that so there's room between comp A and B for me to get more. When I started there was 3 of us, 1 left after two weeks and in 3 months they couldn't find anyone. So I know there's more money, the employer likes me, and they're having a hard time filling the position as it is. I'm only thinking of asking for $5-8/hr more to cover taking a vacation or something.
            – Batman
            Mar 31 '16 at 4:09










          • In that case you may have a chance but again all it takes is to find someone like you who will work for less or same amount, and just show you that they are in power they may let you go. But your chances of getting a raise is high, especially if there is a high turn over rate
            – MelBurslan
            Mar 31 '16 at 4:39










          • Yea I agree. I'm not going to ask for anything outrageous. They're obviously making a cut they want to keep but since I have some leverage here it's now or never. Thanks
            – Batman
            Mar 31 '16 at 4:42


















          up vote
          1
          down vote














          I'm not happy with the initial rate I accepted and am wondering if
          it's appropriate to negotiate the rate moving forward before signing
          the contract extension?




          I assume that you aren't happy with the initial rate, but you took it anyway because you needed the job. And now that you completed the contract, you figure you can get more.



          It's possible, and probably worth asking for a bit more in a professional way.



          Be prepared with what you'll do if the reply is "No".



          Many companies (like the one I work for) assume they can extend a contract pretty much indefinitely without renegotiating the rate. And in my company, if the rate needed to be changed, I'd have to write a new requisition, have it approved up several levels of management, and send it out to the recruiters to fill - even if the original contractor was ready to re-apply. I know this sounds foolish, but it is the way some big companies work. I can extend the period easily, but changing the rate is a big deal.



          If the answer is "No" you want to be ready to either walk, or accept the current rate.






          share|improve this answer





















            Your Answer







            StackExchange.ready(function()
            var channelOptions =
            tags: "".split(" "),
            id: "423"
            ;
            initTagRenderer("".split(" "), "".split(" "), channelOptions);

            StackExchange.using("externalEditor", function()
            // Have to fire editor after snippets, if snippets enabled
            if (StackExchange.settings.snippets.snippetsEnabled)
            StackExchange.using("snippets", function()
            createEditor();
            );

            else
            createEditor();

            );

            function createEditor()
            StackExchange.prepareEditor(
            heartbeatType: 'answer',
            convertImagesToLinks: false,
            noModals: false,
            showLowRepImageUploadWarning: true,
            reputationToPostImages: null,
            bindNavPrevention: true,
            postfix: "",
            noCode: true, onDemand: false,
            discardSelector: ".discard-answer"
            ,immediatelyShowMarkdownHelp:true
            );



            );








             

            draft saved


            draft discarded


















            StackExchange.ready(
            function ()
            StackExchange.openid.initPostLogin('.new-post-login', 'https%3a%2f%2fworkplace.stackexchange.com%2fquestions%2f64493%2fcan-i-negotiate-a-contract-extension%23new-answer', 'question_page');

            );

            Post as a guest

























            StackExchange.ready(function ()
            $("#show-editor-button input, #show-editor-button button").click(function ()
            var showEditor = function()
            $("#show-editor-button").hide();
            $("#post-form").removeClass("dno");
            StackExchange.editor.finallyInit();
            ;

            var useFancy = $(this).data('confirm-use-fancy');
            if(useFancy == 'True')
            var popupTitle = $(this).data('confirm-fancy-title');
            var popupBody = $(this).data('confirm-fancy-body');
            var popupAccept = $(this).data('confirm-fancy-accept-button');

            $(this).loadPopup(
            url: '/post/self-answer-popup',
            loaded: function(popup)
            var pTitle = $(popup).find('h2');
            var pBody = $(popup).find('.popup-body');
            var pSubmit = $(popup).find('.popup-submit');

            pTitle.text(popupTitle);
            pBody.html(popupBody);
            pSubmit.val(popupAccept).click(showEditor);

            )
            else
            var confirmText = $(this).data('confirm-text');
            if (confirmText ? confirm(confirmText) : true)
            showEditor();


            );
            );






            3 Answers
            3






            active

            oldest

            votes








            3 Answers
            3






            active

            oldest

            votes









            active

            oldest

            votes






            active

            oldest

            votes








            up vote
            3
            down vote














            wondering if it's appropriate to negotiate the rate moving forward before signing the contract extension?




            It's entirely appropriate, this is the only real time you can negotiate in. Be aware that you may price yourself out of a job, but the likelihood is high that you will get a raise if you don't ask for too much more. Reason being is that you have 3 months on the job already, know the people, earned some trust and will hit the ground running.






            share|improve this answer





















            • What would be a good justification I could tell them. Like if they say, "Well you agreed to the initial rate" I'm not sure how I'd respond
              – Batman
              Mar 31 '16 at 4:10






            • 1




              I would say it's a new situation, that is the price they would need to pay to continue my services. The original contract ended agreeably on all sides, but it ended.
              – Kilisi
              Mar 31 '16 at 4:17










            • Thank you, i'll give it a shot tomorrow and see how it goes.
              – Batman
              Mar 31 '16 at 4:42







            • 1




              that's pretty much up to you, if it was me I'd turn it down, and they'll either negotiate or not... but I'm not short on work. It's a judgement call, just because someone tells me they're honest doesn't put more money in my pocket and therefore doesn't impress me. So in my case it would be 'Well, sad to hear that, but I need to be making X per hour.' But like I said, I'm not desperate for work... you may have less leeway to take the hard line.
              – Kilisi
              Apr 3 '16 at 23:27







            • 1




              Makes sense. Thanks for your insight Kilisi :)
              – Batman
              Apr 4 '16 at 13:00














            up vote
            3
            down vote














            wondering if it's appropriate to negotiate the rate moving forward before signing the contract extension?




            It's entirely appropriate, this is the only real time you can negotiate in. Be aware that you may price yourself out of a job, but the likelihood is high that you will get a raise if you don't ask for too much more. Reason being is that you have 3 months on the job already, know the people, earned some trust and will hit the ground running.






            share|improve this answer





















            • What would be a good justification I could tell them. Like if they say, "Well you agreed to the initial rate" I'm not sure how I'd respond
              – Batman
              Mar 31 '16 at 4:10






            • 1




              I would say it's a new situation, that is the price they would need to pay to continue my services. The original contract ended agreeably on all sides, but it ended.
              – Kilisi
              Mar 31 '16 at 4:17










            • Thank you, i'll give it a shot tomorrow and see how it goes.
              – Batman
              Mar 31 '16 at 4:42







            • 1




              that's pretty much up to you, if it was me I'd turn it down, and they'll either negotiate or not... but I'm not short on work. It's a judgement call, just because someone tells me they're honest doesn't put more money in my pocket and therefore doesn't impress me. So in my case it would be 'Well, sad to hear that, but I need to be making X per hour.' But like I said, I'm not desperate for work... you may have less leeway to take the hard line.
              – Kilisi
              Apr 3 '16 at 23:27







            • 1




              Makes sense. Thanks for your insight Kilisi :)
              – Batman
              Apr 4 '16 at 13:00












            up vote
            3
            down vote










            up vote
            3
            down vote










            wondering if it's appropriate to negotiate the rate moving forward before signing the contract extension?




            It's entirely appropriate, this is the only real time you can negotiate in. Be aware that you may price yourself out of a job, but the likelihood is high that you will get a raise if you don't ask for too much more. Reason being is that you have 3 months on the job already, know the people, earned some trust and will hit the ground running.






            share|improve this answer














            wondering if it's appropriate to negotiate the rate moving forward before signing the contract extension?




            It's entirely appropriate, this is the only real time you can negotiate in. Be aware that you may price yourself out of a job, but the likelihood is high that you will get a raise if you don't ask for too much more. Reason being is that you have 3 months on the job already, know the people, earned some trust and will hit the ground running.







            share|improve this answer













            share|improve this answer



            share|improve this answer











            answered Mar 31 '16 at 3:47









            Kilisi

            94.5k50216376




            94.5k50216376











            • What would be a good justification I could tell them. Like if they say, "Well you agreed to the initial rate" I'm not sure how I'd respond
              – Batman
              Mar 31 '16 at 4:10






            • 1




              I would say it's a new situation, that is the price they would need to pay to continue my services. The original contract ended agreeably on all sides, but it ended.
              – Kilisi
              Mar 31 '16 at 4:17










            • Thank you, i'll give it a shot tomorrow and see how it goes.
              – Batman
              Mar 31 '16 at 4:42







            • 1




              that's pretty much up to you, if it was me I'd turn it down, and they'll either negotiate or not... but I'm not short on work. It's a judgement call, just because someone tells me they're honest doesn't put more money in my pocket and therefore doesn't impress me. So in my case it would be 'Well, sad to hear that, but I need to be making X per hour.' But like I said, I'm not desperate for work... you may have less leeway to take the hard line.
              – Kilisi
              Apr 3 '16 at 23:27







            • 1




              Makes sense. Thanks for your insight Kilisi :)
              – Batman
              Apr 4 '16 at 13:00
















            • What would be a good justification I could tell them. Like if they say, "Well you agreed to the initial rate" I'm not sure how I'd respond
              – Batman
              Mar 31 '16 at 4:10






            • 1




              I would say it's a new situation, that is the price they would need to pay to continue my services. The original contract ended agreeably on all sides, but it ended.
              – Kilisi
              Mar 31 '16 at 4:17










            • Thank you, i'll give it a shot tomorrow and see how it goes.
              – Batman
              Mar 31 '16 at 4:42







            • 1




              that's pretty much up to you, if it was me I'd turn it down, and they'll either negotiate or not... but I'm not short on work. It's a judgement call, just because someone tells me they're honest doesn't put more money in my pocket and therefore doesn't impress me. So in my case it would be 'Well, sad to hear that, but I need to be making X per hour.' But like I said, I'm not desperate for work... you may have less leeway to take the hard line.
              – Kilisi
              Apr 3 '16 at 23:27







            • 1




              Makes sense. Thanks for your insight Kilisi :)
              – Batman
              Apr 4 '16 at 13:00















            What would be a good justification I could tell them. Like if they say, "Well you agreed to the initial rate" I'm not sure how I'd respond
            – Batman
            Mar 31 '16 at 4:10




            What would be a good justification I could tell them. Like if they say, "Well you agreed to the initial rate" I'm not sure how I'd respond
            – Batman
            Mar 31 '16 at 4:10




            1




            1




            I would say it's a new situation, that is the price they would need to pay to continue my services. The original contract ended agreeably on all sides, but it ended.
            – Kilisi
            Mar 31 '16 at 4:17




            I would say it's a new situation, that is the price they would need to pay to continue my services. The original contract ended agreeably on all sides, but it ended.
            – Kilisi
            Mar 31 '16 at 4:17












            Thank you, i'll give it a shot tomorrow and see how it goes.
            – Batman
            Mar 31 '16 at 4:42





            Thank you, i'll give it a shot tomorrow and see how it goes.
            – Batman
            Mar 31 '16 at 4:42





            1




            1




            that's pretty much up to you, if it was me I'd turn it down, and they'll either negotiate or not... but I'm not short on work. It's a judgement call, just because someone tells me they're honest doesn't put more money in my pocket and therefore doesn't impress me. So in my case it would be 'Well, sad to hear that, but I need to be making X per hour.' But like I said, I'm not desperate for work... you may have less leeway to take the hard line.
            – Kilisi
            Apr 3 '16 at 23:27





            that's pretty much up to you, if it was me I'd turn it down, and they'll either negotiate or not... but I'm not short on work. It's a judgement call, just because someone tells me they're honest doesn't put more money in my pocket and therefore doesn't impress me. So in my case it would be 'Well, sad to hear that, but I need to be making X per hour.' But like I said, I'm not desperate for work... you may have less leeway to take the hard line.
            – Kilisi
            Apr 3 '16 at 23:27





            1




            1




            Makes sense. Thanks for your insight Kilisi :)
            – Batman
            Apr 4 '16 at 13:00




            Makes sense. Thanks for your insight Kilisi :)
            – Batman
            Apr 4 '16 at 13:00












            up vote
            1
            down vote













            The reason they liked you most probably, along with you producing a good outcome for whatever you are doing but you are doing it for cheaper than other they may hire. By trying to renegotiate your contract, you may be taking yourself out of the market. If you are sure that you are grossly underpaid, we are not talking about a few dollars per hour but 15-20% =, you can go to your company today and tell them that at the end of your initial contract period, you demand this much rate per hour, otherwise you are looking for a new opportunity. They may accept or they may say "good-bye.. nice was knowing you." If you are ready for that, you can negotiate your contract to your heart's content. It is the best thing about free market economy, unless you are living somewhere in deep Eastern Europe or (gasp) China






            share|improve this answer

















            • 1




              Well I have a few things going for me, I am a sub-sub-contractor. So it's Government > Comp A > Comp B > Me. They accidentally gave me the contract between Government and Comp A so I know that I'm making about 58% of that so there's room between comp A and B for me to get more. When I started there was 3 of us, 1 left after two weeks and in 3 months they couldn't find anyone. So I know there's more money, the employer likes me, and they're having a hard time filling the position as it is. I'm only thinking of asking for $5-8/hr more to cover taking a vacation or something.
              – Batman
              Mar 31 '16 at 4:09










            • In that case you may have a chance but again all it takes is to find someone like you who will work for less or same amount, and just show you that they are in power they may let you go. But your chances of getting a raise is high, especially if there is a high turn over rate
              – MelBurslan
              Mar 31 '16 at 4:39










            • Yea I agree. I'm not going to ask for anything outrageous. They're obviously making a cut they want to keep but since I have some leverage here it's now or never. Thanks
              – Batman
              Mar 31 '16 at 4:42















            up vote
            1
            down vote













            The reason they liked you most probably, along with you producing a good outcome for whatever you are doing but you are doing it for cheaper than other they may hire. By trying to renegotiate your contract, you may be taking yourself out of the market. If you are sure that you are grossly underpaid, we are not talking about a few dollars per hour but 15-20% =, you can go to your company today and tell them that at the end of your initial contract period, you demand this much rate per hour, otherwise you are looking for a new opportunity. They may accept or they may say "good-bye.. nice was knowing you." If you are ready for that, you can negotiate your contract to your heart's content. It is the best thing about free market economy, unless you are living somewhere in deep Eastern Europe or (gasp) China






            share|improve this answer

















            • 1




              Well I have a few things going for me, I am a sub-sub-contractor. So it's Government > Comp A > Comp B > Me. They accidentally gave me the contract between Government and Comp A so I know that I'm making about 58% of that so there's room between comp A and B for me to get more. When I started there was 3 of us, 1 left after two weeks and in 3 months they couldn't find anyone. So I know there's more money, the employer likes me, and they're having a hard time filling the position as it is. I'm only thinking of asking for $5-8/hr more to cover taking a vacation or something.
              – Batman
              Mar 31 '16 at 4:09










            • In that case you may have a chance but again all it takes is to find someone like you who will work for less or same amount, and just show you that they are in power they may let you go. But your chances of getting a raise is high, especially if there is a high turn over rate
              – MelBurslan
              Mar 31 '16 at 4:39










            • Yea I agree. I'm not going to ask for anything outrageous. They're obviously making a cut they want to keep but since I have some leverage here it's now or never. Thanks
              – Batman
              Mar 31 '16 at 4:42













            up vote
            1
            down vote










            up vote
            1
            down vote









            The reason they liked you most probably, along with you producing a good outcome for whatever you are doing but you are doing it for cheaper than other they may hire. By trying to renegotiate your contract, you may be taking yourself out of the market. If you are sure that you are grossly underpaid, we are not talking about a few dollars per hour but 15-20% =, you can go to your company today and tell them that at the end of your initial contract period, you demand this much rate per hour, otherwise you are looking for a new opportunity. They may accept or they may say "good-bye.. nice was knowing you." If you are ready for that, you can negotiate your contract to your heart's content. It is the best thing about free market economy, unless you are living somewhere in deep Eastern Europe or (gasp) China






            share|improve this answer













            The reason they liked you most probably, along with you producing a good outcome for whatever you are doing but you are doing it for cheaper than other they may hire. By trying to renegotiate your contract, you may be taking yourself out of the market. If you are sure that you are grossly underpaid, we are not talking about a few dollars per hour but 15-20% =, you can go to your company today and tell them that at the end of your initial contract period, you demand this much rate per hour, otherwise you are looking for a new opportunity. They may accept or they may say "good-bye.. nice was knowing you." If you are ready for that, you can negotiate your contract to your heart's content. It is the best thing about free market economy, unless you are living somewhere in deep Eastern Europe or (gasp) China







            share|improve this answer













            share|improve this answer



            share|improve this answer











            answered Mar 31 '16 at 3:43









            MelBurslan

            7,00511123




            7,00511123







            • 1




              Well I have a few things going for me, I am a sub-sub-contractor. So it's Government > Comp A > Comp B > Me. They accidentally gave me the contract between Government and Comp A so I know that I'm making about 58% of that so there's room between comp A and B for me to get more. When I started there was 3 of us, 1 left after two weeks and in 3 months they couldn't find anyone. So I know there's more money, the employer likes me, and they're having a hard time filling the position as it is. I'm only thinking of asking for $5-8/hr more to cover taking a vacation or something.
              – Batman
              Mar 31 '16 at 4:09










            • In that case you may have a chance but again all it takes is to find someone like you who will work for less or same amount, and just show you that they are in power they may let you go. But your chances of getting a raise is high, especially if there is a high turn over rate
              – MelBurslan
              Mar 31 '16 at 4:39










            • Yea I agree. I'm not going to ask for anything outrageous. They're obviously making a cut they want to keep but since I have some leverage here it's now or never. Thanks
              – Batman
              Mar 31 '16 at 4:42













            • 1




              Well I have a few things going for me, I am a sub-sub-contractor. So it's Government > Comp A > Comp B > Me. They accidentally gave me the contract between Government and Comp A so I know that I'm making about 58% of that so there's room between comp A and B for me to get more. When I started there was 3 of us, 1 left after two weeks and in 3 months they couldn't find anyone. So I know there's more money, the employer likes me, and they're having a hard time filling the position as it is. I'm only thinking of asking for $5-8/hr more to cover taking a vacation or something.
              – Batman
              Mar 31 '16 at 4:09










            • In that case you may have a chance but again all it takes is to find someone like you who will work for less or same amount, and just show you that they are in power they may let you go. But your chances of getting a raise is high, especially if there is a high turn over rate
              – MelBurslan
              Mar 31 '16 at 4:39










            • Yea I agree. I'm not going to ask for anything outrageous. They're obviously making a cut they want to keep but since I have some leverage here it's now or never. Thanks
              – Batman
              Mar 31 '16 at 4:42








            1




            1




            Well I have a few things going for me, I am a sub-sub-contractor. So it's Government > Comp A > Comp B > Me. They accidentally gave me the contract between Government and Comp A so I know that I'm making about 58% of that so there's room between comp A and B for me to get more. When I started there was 3 of us, 1 left after two weeks and in 3 months they couldn't find anyone. So I know there's more money, the employer likes me, and they're having a hard time filling the position as it is. I'm only thinking of asking for $5-8/hr more to cover taking a vacation or something.
            – Batman
            Mar 31 '16 at 4:09




            Well I have a few things going for me, I am a sub-sub-contractor. So it's Government > Comp A > Comp B > Me. They accidentally gave me the contract between Government and Comp A so I know that I'm making about 58% of that so there's room between comp A and B for me to get more. When I started there was 3 of us, 1 left after two weeks and in 3 months they couldn't find anyone. So I know there's more money, the employer likes me, and they're having a hard time filling the position as it is. I'm only thinking of asking for $5-8/hr more to cover taking a vacation or something.
            – Batman
            Mar 31 '16 at 4:09












            In that case you may have a chance but again all it takes is to find someone like you who will work for less or same amount, and just show you that they are in power they may let you go. But your chances of getting a raise is high, especially if there is a high turn over rate
            – MelBurslan
            Mar 31 '16 at 4:39




            In that case you may have a chance but again all it takes is to find someone like you who will work for less or same amount, and just show you that they are in power they may let you go. But your chances of getting a raise is high, especially if there is a high turn over rate
            – MelBurslan
            Mar 31 '16 at 4:39












            Yea I agree. I'm not going to ask for anything outrageous. They're obviously making a cut they want to keep but since I have some leverage here it's now or never. Thanks
            – Batman
            Mar 31 '16 at 4:42





            Yea I agree. I'm not going to ask for anything outrageous. They're obviously making a cut they want to keep but since I have some leverage here it's now or never. Thanks
            – Batman
            Mar 31 '16 at 4:42











            up vote
            1
            down vote














            I'm not happy with the initial rate I accepted and am wondering if
            it's appropriate to negotiate the rate moving forward before signing
            the contract extension?




            I assume that you aren't happy with the initial rate, but you took it anyway because you needed the job. And now that you completed the contract, you figure you can get more.



            It's possible, and probably worth asking for a bit more in a professional way.



            Be prepared with what you'll do if the reply is "No".



            Many companies (like the one I work for) assume they can extend a contract pretty much indefinitely without renegotiating the rate. And in my company, if the rate needed to be changed, I'd have to write a new requisition, have it approved up several levels of management, and send it out to the recruiters to fill - even if the original contractor was ready to re-apply. I know this sounds foolish, but it is the way some big companies work. I can extend the period easily, but changing the rate is a big deal.



            If the answer is "No" you want to be ready to either walk, or accept the current rate.






            share|improve this answer

























              up vote
              1
              down vote














              I'm not happy with the initial rate I accepted and am wondering if
              it's appropriate to negotiate the rate moving forward before signing
              the contract extension?




              I assume that you aren't happy with the initial rate, but you took it anyway because you needed the job. And now that you completed the contract, you figure you can get more.



              It's possible, and probably worth asking for a bit more in a professional way.



              Be prepared with what you'll do if the reply is "No".



              Many companies (like the one I work for) assume they can extend a contract pretty much indefinitely without renegotiating the rate. And in my company, if the rate needed to be changed, I'd have to write a new requisition, have it approved up several levels of management, and send it out to the recruiters to fill - even if the original contractor was ready to re-apply. I know this sounds foolish, but it is the way some big companies work. I can extend the period easily, but changing the rate is a big deal.



              If the answer is "No" you want to be ready to either walk, or accept the current rate.






              share|improve this answer























                up vote
                1
                down vote










                up vote
                1
                down vote










                I'm not happy with the initial rate I accepted and am wondering if
                it's appropriate to negotiate the rate moving forward before signing
                the contract extension?




                I assume that you aren't happy with the initial rate, but you took it anyway because you needed the job. And now that you completed the contract, you figure you can get more.



                It's possible, and probably worth asking for a bit more in a professional way.



                Be prepared with what you'll do if the reply is "No".



                Many companies (like the one I work for) assume they can extend a contract pretty much indefinitely without renegotiating the rate. And in my company, if the rate needed to be changed, I'd have to write a new requisition, have it approved up several levels of management, and send it out to the recruiters to fill - even if the original contractor was ready to re-apply. I know this sounds foolish, but it is the way some big companies work. I can extend the period easily, but changing the rate is a big deal.



                If the answer is "No" you want to be ready to either walk, or accept the current rate.






                share|improve this answer














                I'm not happy with the initial rate I accepted and am wondering if
                it's appropriate to negotiate the rate moving forward before signing
                the contract extension?




                I assume that you aren't happy with the initial rate, but you took it anyway because you needed the job. And now that you completed the contract, you figure you can get more.



                It's possible, and probably worth asking for a bit more in a professional way.



                Be prepared with what you'll do if the reply is "No".



                Many companies (like the one I work for) assume they can extend a contract pretty much indefinitely without renegotiating the rate. And in my company, if the rate needed to be changed, I'd have to write a new requisition, have it approved up several levels of management, and send it out to the recruiters to fill - even if the original contractor was ready to re-apply. I know this sounds foolish, but it is the way some big companies work. I can extend the period easily, but changing the rate is a big deal.



                If the answer is "No" you want to be ready to either walk, or accept the current rate.







                share|improve this answer













                share|improve this answer



                share|improve this answer











                answered Mar 31 '16 at 11:20









                Joe Strazzere

                222k102649914




                222k102649914






















                     

                    draft saved


                    draft discarded


























                     


                    draft saved


                    draft discarded














                    StackExchange.ready(
                    function ()
                    StackExchange.openid.initPostLogin('.new-post-login', 'https%3a%2f%2fworkplace.stackexchange.com%2fquestions%2f64493%2fcan-i-negotiate-a-contract-extension%23new-answer', 'question_page');

                    );

                    Post as a guest

















































































                    Comments

                    Popular posts from this blog

                    What does second last employer means? [closed]

                    List of Gilmore Girls characters

                    One-line joke